Rapid Assessment Surveying Before Construction Work

Picarro Surveyor has been used to survey both before and after building demolition near gas assets. The system is ideal for this use case since surveys can be conducted rapidly and Picarro’s digital geo-spatial maps of leak indication locations (such as from existing Grade-3 leaks) can be easily compared for the pre- and post-demolition surveys which can easily identify new leaks potentially caused by the demolition. Similarly, rapid survey can be conducted before roadwork and other construction.

Rapid Assessment Before Construction

Area (13 miles of main) surveyed in less than 2 days that would have taken a month to survey with traditional walking methods.